主要业绩如下(Main achievements):





序号

NO.

项目名称

Project Title


1

武汉钢铁有限公司炼铁厂1#高炉大修



Overhaul project for 1# blast furnace of ironworks in WISCO Ltd.


2

武汉钢铁有限公司炼铁厂1#高炉出铁场及渣铁钩砌筑工程



Construction project for cast house and roughing runner of 1# blast furnace of ironworks in WISCO Ltd.


3

武汉钢铁有限公司炼铁厂2#高炉拆除检修工程



Removal and maintenance project for 2# blast furnace of ironworks in WISCO Ltd.


4

武汉钢铁有限公司炼铁厂2#高炉主体系统西出铁场耐材砌筑工程



Refractory construction project for west cast house in main unit of 2# blast furnace of ironworks in WISCO Ltd.


5

武汉钢铁有限公司炼铁厂2#高炉大修改造高炉本体系统建安工程施工



Construction and installation project for overhaul & reforming engineering of 2# blast furnace body in ironworks of WISCO Ltd.


6

武汉钢铁有限公司炼铁厂3#高炉易地改造出铁场系统耐火材料砌筑工程



Refractory construction project of cast house for 3# blast furnace modification engineering in ironworks of WISCO Ltd.


7

武汉钢铁有限公司炼铁厂6#高炉出铁场平台耐火材料内衬砌筑工程



Refractory lining construction for platform of cast house of 6# blast furnace in ironworks of WISCO Ltd.


8

武汉钢铁有限公司炼铁厂7#高炉出铁场平台耐火材料内衬砌筑工程



Refractory lining construction for platform of cast house of 7# blast furnace in ironworks of WISCO Ltd.


9

武汉钢铁有限公司炼铁厂8#高炉大修



Overhaul project for 8# blast furnace of ironworks of WISCO Ltd.


10

武汉钢铁有限公司炼铁厂8#高炉1#、2#INBA蒸汽排放改造工程粒化槽冷凝塔内衬耐材施工



Refractory construction of condensation tower in granulation tank for steam discharge reforming engineering of 1#, 2# INBA in 8# blast furnace of ironworks, WISCO Ltd.


11

鄂钢铁前事业部1#高炉大修工程



Overhaul project for 1# blast furnace in hot metal division of Echeng Steel.


12

鄂钢铁前事业部1#高炉3#热风炉大修



Overhaul project for 3# hot blast stove in hot metal division of Echeng Steel.


13

鄂钢铁前事业部2#高炉主沟大修



Overhaul project for sow channel of 2# blast furnace in hot metal division of Echeng Steel.


14

鄂钢铁前事业部2#高炉大修



Overhaul project for 2# blast furnace in hot metal division of Echeng Steel.


15

鄂钢铁前事业部4#高炉1#热风炉大修



Overhaul project for 1# hot blast stove of 4# blast furnace in hot metal division of Echeng Steel.


16

鄂钢铁前事业部5#高炉烟气炉、热风炉、西粒化塔检修



Maintenance project for combustion furnace,hot blast stove and west granulation tower of 5# blast furnace in hot metal division of Echeng Steel.


17

马来西亚东钢综合钢铁厂一期一步炼铁工程耐火材料砌筑



Refractory construction for phase 1 one-step iron making project of integrated steel works, Oriental Steel Industries SDN Bhd, Malaysia.


18

宝钢集团新疆八一钢铁有限公司新建解冻库热风炉本体砌筑项目



Hot blast stove proper construction project for new thawing Shed in Bayi Steel Company, Baowu Group.


19

辽宁本钢二铁厂1#高炉易地大修工程2#热风炉内衬砌筑工程



2# hot blast stove lining construction project for 1# blast furnace modification engineering in No.2 ironworks of Benxi Steel Group Corporation.


20

辽宁本钢二铁厂4#高炉(2600)3#热风炉及热风直管、围管砌筑工程



Construction project for 3# hot blast stove and its straight tube and bustle pipe in 4# blast furnace (2600 m³of No.2 ironworks of Benxi Steel Group Corporation.


21

云南红河钢铁有限公司新增2#高炉4#热风炉炉窑部分



Furnace construction for 4# hot blast stove of new 2# blast furnace in Honghe Iron and Steel Co.,Ltd.


22

柳钢炼铁厂5#高炉炉缸大修改造工程



Overhaul project for hearth of 5# blast furnace in ironworks of Guangxi Liuzhou Iron and Steel Group Company Limited.


23

四平现代钢铁有限公司8#热风炉和烟囱新建工程



New building project for 8#hot blast stove and chimney in Siping Modern Steel Co.,Ltd.


24

云南德钢环保搬迁工程炼铁项目的1#高炉的高炉本体、出铁场、煤气系统及热风炉系统的耐材砌筑工程



Refractory construction engineering for 1# blast furnace proper, cast house, gas system and hot blast stove in ironworks of relocation project of Yunnan Desheng Steel Co.,Ltd.


25

济南广福集团380m³高炉检修工程



Maintenance project for 380m³ blast furnace in Jinan Guangfu Group.


26

北营节能减排、淘汰落后高炉改造新建1#高炉热风炉管道砌筑工程



Hot blast stove pipe construction engineering for new 1# blast furnace in reforming project of Beiying Steel of Benxi Steel Group Corporation.


27

衡钢1080m³高炉一条主沟检修



Maintenance for sow channel of 1080m³ blast furnace in Hengyang Steel.


28

河南南阳汉冶特钢有限公司铁前技改一期项目



Technical transformation project (phase 1) of ironworks in Nanyang Hanye Special Steel Co.,Ltd, Henan Longcheng Group.


29

河南南阳汉冶特钢有限公司炼铁厂1#、2#、3#高炉及热风炉喷涂、砌砖、灌浆维护项目



Patching, Construction and Grouting Maintenance project for 1#, 2#, 3# blast furnace and hot blast stove of ironworks in Nanyang Hanye Special Steel Co.,Ltd, Henan Longcheng Group.


30

江苏沙钢集团淮澳钢铁有限公司6#高炉炼铁系统工程



Ironworks engineering for 6# blast furnace in Huai-ao Iron &Steel Co.,Ltd of Shagang Group.


31

江苏利淮钢铁高炉及热风炉检修工程



Maintenance project for blast furnace and hot blast stove in Lihuai Steel Co.,Ltd.


32

莱芜市九羊福利铁厂有限公司1#高炉3#热风炉的修复浇筑



Repair and construction for 1# blast furnace and 3# hot blast stove in Jiuyang Fuli Iron and Steel Co.,Ltd.


33

冷水江钢铁总厂5#高炉本体、热风直管围管耐火材料砌筑施工安装总承包及热风炉本体耐火材料砌筑



General contracting of Refractory construction & installation for 5# blast furnace proper, straight tube and bustle pipe, and refractory construction for hot blast stove body in Lengshuijiang Steel Mill.


34

湖南华菱涟钢新1#高炉系统及热风炉系统耐火材料砌筑



Refractory construction for new 1# blast furnace and hot blast stove in Valin Lianyuan Steel, Hunan Province.


35

湖南华菱湘潭钢铁公司3#高炉大修改造工程炉窑工程



Furnace construction for Overhaul and Reformation engineering of 3# blast furnace in Hunan Valin Xiangtan Iron and Steel Co.,Ltd.


36

湖南华菱湘潭钢铁公司1#高炉易地大修热风炉项目炉窑砌筑工程



Hot blast stove furnace construction for 1# blast furnace modification engineering in Hunan Valin Xiangtan Iron and Steel Co.,Ltd.


37

唐山世纪晨晖钢铁制品有限公司300m³高炉大修工程



Overhaul project of 300m³ blast furnace in Tangshan Shiji-Chenghui Steel Products Co.,Ltd.


38

唐山世纪晨晖钢铁制品有限公司230m³高炉大修工程



Overhaul project of 230m³ blast furnace in Tangshan Shiji-Chenghui Steel Products Co.,Ltd.


39

唐山众业不锈钢有限公司179高炉中修工程



Repair and maintenance project of 179m³ blast furnace in Tangshan Zhongye Stainess Steel Co.,Ltd.


40

芜湖新兴铸管公司300高炉热风炉内衬砌筑



Hot blast stove lining construction of 300m³ blast furnace in Wuhu Xinxing Ductile Iron Pipes Co.,Ltd.


41

大冶特钢炼铁厂1#高炉大修改造热风炉耐材砌筑工程



Hot blast stove refractory construction for overhaul project of 1# blast furnace in ironworks of Daye Special Steel Co.,Ltd.


42

大冶特钢炼铁厂2#高炉大修热风炉耐材砌筑工程



Hot blast stove refractory construction for overhaul project of 2# blast furnace in ironworks of Daye Special Steel Co.,Ltd.


43

新疆金昊铁业有限公司2×500m³炼铁建安工程1#高炉、热风炉耐火材料砌筑项目



Refractory construction for 1# blast furnace and hot blast stove in 2×500m³ ironworks construction & Installation engineering in Xinjiang Jinhao Iron Industry Co.,Ltd.